Carbon Management Plan 2024
Rushcliffe Borough Council Carbon Management Plan 2024
Themes:
Property Assets;
Fleet and Transport;
Contracts and Procurement;
Policy and Regulation;
Waste and Recycling;
Operational Activities;
Community and Businesses;
Offsetting
1. Property Assets
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
Following on from the delivery of the Heat Decarbonisation plans resourced by Shared Prosperity Fund, use these to bid into future SALIX pots. A bid has been put into Public Sector Decarbonisation Scheme 3c for Julian Cahn and Gamston Community Hall | 1.1 | Property Services | Within 1 to 2 years Completed | Medium (5-25%) - Can provide up to |
Deliver innovative zero carbon heating solutions to the most carbon emitting leisure centres using grant funding from SALIX. Utilise other grant streams to further improve existing low carbon / net zero assets similar to the Rushcliffe Country Park. Deliver SALIX PSDS 3b project to decarbonise Cotgrave Leisure Centre. Heat pump unit is currently being manufactured thanks to detailed designs being completed. | 1.2 | Property Services | Between 2 and 5 years | High (greater than 25%) e.g. 20 - 40% saving for heat pumps over conventional |
Build upon the energy data benchmark that has been established for the RBC stock data and use the ongoing energy auditing to capitalise on the most cost/carbon saving recommendations such as power perfectors and/or zoning controls for heating. Completed - This is being considered under the HDP plans being written. Leisure energy is specifically exploring the Rushcliffe Arena CHP unit and this will feed into the above. Once collated, again this can be put into a large SALIX bid. | 1.3 | Property Services | Within 1 to 2 years | Medium (5-25%) - up |
Investigate purchasing green energy tariffs (however this is not taken into account in official Green House Gas emission audits – only in-house generation can be included) | 1.4 | Property Services | Within 1 to 2 years | High (greater than 25%) - 281 tonnes (grid electricity, if 100% green grid |
Undertake a feasibility study of using natural ventilation mechanisms on property portfolio buildings | 1.5 | Property Services | Between 2 and 5 years | To be considered |
Deliver upgrade to power supply on the Croquet Lawn in West Bridgford to reduce use of diesel generators at events and markets | 1.6 | Property Services | Between 2 and 5 years | Low (less than 5%) - 10 KW generator replaced by grid electricity equals 4 Kg CO2 per hour saving |
Review the portfolio of leisure centres including Cotgrave, East Leake and Keyworth and consider installation of solar photovoltaic in order to deliver large savings on the running costs due to the high electricity demand from the | 1.7 | Waste and Contracts | From 5 to 10 years | High (greater than 25%) - Up to 30% Leisure Centre emissions (WebRef2) |
Build upon the energy data monitoring exercise that has happened and work to establish if a cloud-based system can be demonstrated as a cost saving system as well as a major potential carbon saving scheme. | 1.8 | ICT | Between 2 and 5 years | Low (less than 5%) |
Review the carbon footprint of e-services and cloud-based services and consider how council service can best be delivered (including e-services, documents transfer and electronic postage and online public services). | 1.9 | ICT | Between 2 and 5 years | Low (less than 5%) |
Consider business case to purchase empty properties, retrofit and resell in line with empty homes policy | 1.10 | Strategic Housing | From 5 to 10 years | Not applicable |
Provide free to use cold-water dispenser in all public areas of property portfolio (including Leisure Centres) | 1.11 | Property Services | Between 2 and 5 years | Not applicable |
Promote improved energy efficiency standards for RBC residents. Actively explore funding opportunities. Promote and deliver them | 1.12 | Community | Between 2 and 5 years | More than 5% |
Support the Council’s estates team to explore alternative premises (SAP rated A/B) to utilise as the council’s homeless hostel or, if that is not feasible, explore retrofit options for the existing premises. | 1.13 | Property Services Strategic Housing | From 5 to 10 years | More than 5% |
LAD 3 / HUG 1 complete, HUG 2and DEVO underway, both of which are 2 year projects. This will deliver energy efficiency / renewable energy interventions to around another 60 homes. | 1.14 | Community | Within 1 to 2 years | Not applicable |
2. Fleet and Transport
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
CENEX fleet report now completed and has mapped out a very comprehensive decarbonisation plan for all council fleet. This has allowed us to confirm our strategic plan to switch to HVO for our large fleet in order to drop our carbon emissions by 90%. This will also allow us the time to be able to evaluate the best long term zero carbon strategy for the future vehicles. | 2.1 | Waste and Contracts | From 5 to 10 years | High (greater than 25%) - greater than 70% transport |
Investigate and replace / upgrade, small vans / vehicles with electric powered vehicles (including establishing charging infrastructure) [including R2Go, facilities, Country Park and dog control van and now Streetwise], included within the above review. | 2.2 | Waste and Contracts | Between 2 and 5 years | Medium (5-25%) - 17- |
Integrate driver training with annual certification and investigate ‘in cab’ monitoring and route optimisation | 2.3 | Waste and Contracts | Between 1 and 5 years | Low (less than 5%) - 15% fuel saving (estimated) |
Promote active travel to the public (e.g. school travel plans including accreditation (stars) and walking bus; travel choice programme including active travel; well-being at work scheme / work place health; Business e-bike scheme; healthy futures fund – cycling on prescription; Community cycling groups; Ridewise training) walking and cycling action plan | 2.4 | Community | Between 2 and 5 years | Low impact on council |
Develop a staff travel promotion / incentive scheme for alternative travel | 2.5 | Financial Services | Within 1 to 2 years | Low (less than 5%) |
Widen access to the Staff Cycle purchase scheme | 2.6 | Financial Services | Within 1 to 2 years | Low (less than 5%) |
Extending provision of EV charging points on the Rushcliffe estate e.g. in borough car parks. Working with Zest Energy and rolling out a funded scheme across all viable car parks to include West Bridgford and Cotgrave Leisure Centre. | 2.7 | Community | Between 2 and 5 years | Low (less than 5%) |
Develop a strategy for further EV charging points across the borough | 2.8 | Economic | Between 2 and 5 years | Low (less than 5%) |
3. Contracts and Procurement
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
Leisure operator contractual obligations. - Build energy targets into the new leisure provider contract and monthly energy use monitoring | 3.1 | Waste and Contracts | Within 1 to 2 years | Low (less than 5%) |
Build into current contract / extension for leisure operator that green energy tariffs must be used at new Bingham Leisure Centre | 3.2 | Waste and Contracts | Within 1 to 2 years | Not applicable |
Ground Maintenance operator contractual obligations. - Build travel / fuel emission targets into the Ground Maintenance provider contract and monthly fuel monitoring of Rushcliffe contract | 3.3 | Waste and Contracts | Between 2 and 5 years | Medium |
Review purchasing / procurement policy to prioritise sustainability | 3.4 | Financial Services | Within 1 to 2 years | Not measured |
Implement the £1,200,000 Public Sector Decarbonisation Plan 3b (PSDS 3b) to decarbonise Cotgrave Swimming Pool. Use this as a template to roll out to other buildings and assets where applicable to attract such funding in the future. | 3.5 | Property Services | From 5 to 10 years | High (greater than 25%) - up to 30% of |
Work with Metropolitan Thames Valley Housing to facilitate them installing another 90 external wall insulation installations in East Leake. They are now acting on this with land provided by the Council to site a works compound. | 3.6 | Strategic Housing | Between 2 and 5 years | Low (less than 5%) |
4. Policy and Regulation
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
Promote carbon reduction policies and guidance to developers working in Rushcliffe and ensure Health Development Checklist used for all appropriate planning applications. Biodiversity Net Gain (BNG) is now live and the Ecology and Biodiversity Team are working closely with Planning to implement this. They are also reviewing land, policy and private BNG providers to explore off setting within and just out of the Borough. | 4.1 | Planning and Growth | Within 1 to 2 years | Low impact on council |
Continue to work with Estates in order to identify and bid into future schemes such as SALIX to further improve existing stock using the Heat Decarbonisation Plans (HDP) that have been funded through the Shared Prosperity Funding | 4.2 | Financial Services | Between 2 and 5 years | Low impact on council |
Introduce all HIMOs to have conditions on licence for minimum energy efficiency standards (e.g. EPC rating E or better) | 4.3 | Environmental | Within 1 to 2 years | Low impact on council |
Enforcement of minimum energy efficiency standards in the private rented sector (PRS) | 4.4 | Environmental | Variable - 1 to 10 years | Low impact on council |
Introduce Taxi licensing minimum vehicle emission requirement (e.g. maximum age of vehicle, EURO class, emissions monitoring etc) | 4.5 | Environmental | Between 2 and 5 years | Low impact on council |
Review Air Quality Strategy to include carbon reduction targets | 4.6 | Environmental | Within 1 to 2 years | Low impact on council |
Implement an Environmental Ethical Investment Policy | 4.7 | Financial Services | Within 1 to 2 years | Not measured |
Review Service level agreements to include sustainability criteria (including RCAN, RCVS, Professional Sports Club, Notts Wildlife Trust) | 4.8 | Community | Within 1 to 2 years | Low impact on council |
Review and update the standards and conditions document for allotments (including West Bridgford allotments)– sustainability, materials, waste, energy, water supply and capture etc. | 4.9 | Community | Within 1 to 2 years | Low impact on council |
Review and implement the market quality and standards documents to address sustainability, plastic packaging and bags etc | 4.10 | Economic Growth | Within 1 to 2 years | Low impact on council |
Ensure at least minimum energy efficiency standards are achieved in new funded social housing [Investigate non gas grid solutions] | 4.11 | Strategic Housing | Within 1 to 2 years | Low impact on council |
Work with Registered Provider partners on a sub-regional basis to review their existing stock assets and support bids to improve energy efficiency. Metropolitan Thames Valley Housing are delivering 90 EWI installs as part of the Social Housing Decarbonisation Fund programme in East Leake. This is aimed at the British Iron and Steel Federation (BISF) concrete prefabricated homes. | 4.12 | Strategic Housing | - | - |
Working collectively to support the delivery of the D2N2 Energy Strategy and develop and deliver tangible energy action plans and area wide carbon reduction. | 4.13 | Executive Management Team | - | - |
Work closely with D2N2 on the devolution strategies in order to ensure that collaborative funding bids can be captured such as regional energy mapping and large scale energy schemes (batteries, solar and / or retrofit. Working closely with County Council to deliver a buik buy solar electric scheme for all residents within the Borough. Also developing a series of off the shelf procured Devolution retrofit scheme that can be easily invested into by the elected Mayor. | 4.14 | Senior | Between 2 and 5 years | - |
Support the development of a masterplan for the Ratcliffe on Soar site which maximises the assets on the site including the grid connection which lends itself to the site being a test bed for next generation energy production. | 4.15 | Economic | Within 5 to 10 years | Low (less than 5%) |
Develop Supplementary Planning Documents e.g. for Energy Efficiency and low carbon developments; Renewable Energy; Climate Adaptation; Green Infrastructure etc | 4.16 | Planning Policy | Between 2 and 5 years | Low (less than 5%) |
Investigate requiring new developments to provide a ‘carbon score’ showing the carbon footprint of each property and its likely running cost | 4.7 | Planning Policy | Between 2 and 5 years | Low (less than 5%) |
Develop climate adaptation plans for Rushcliffe | 4.18 | Community | Between 2 and 5 years | Low (less than 5%) |
Follow up monitoring of Environmental Policy and action plans arsing from new requirement in SLA. | 4.19 | Community | Between 2 and 5 years | Low (less than 5%) |
Biodiversity NET Gain - Biodiversity credits. Creating land bank. | 4.20 | Community | Within 5 to 10 years | Medium (5-25%) |
Speak with Landowners in RBC to see if we can influence Biodiversity. (Leisure providers, 4 private golf courses plus Edwalton) | 4.21 | Community | Within 5 to 10 years | Medium (5-25%) |
Assess the impact the Environment Bill will have and the implications this will have for RBC | 4.22 | Community | Between 2 and 5 years | Medium (5-25%) |
5. Waste and Recycling
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
Prepare for the requirements of the Resources and Waste Strategy for England and Environment Act on waste and recycling collection and segregation | 5.1 | Waste and Contracts | Between 2 and 5 years | To be considered |
Resident behaviour change campaigns - waste minimisation | 5.2 | Waste and Recycling | Between 2 and 5 years | Low (less than 5%) |
Communications project on high carbon waste items (food, textiles, batteries and plastics) | 5.3 | Waste and Recycling | Between 2 and 5 years | Low (less than 5%) |
Investigate the potential impact of deposit return scheme on kerbside collections | 5.4 | Waste and Recycling | Between 2 and 5 years | Low (less than 5%) |
Investigate the use of carbon impact targets over weight data | 5.5 | Waste and Recycling | Within 1 to 2 years | Medium (5-25%) |
Fuel/carbon impact (if measurable) in returning for missed bins | 5.6 | Waste and Recycling | Within 1 to 2 years | Medium (5-25%) |
Investigate impact of housing growth on refuse collections and how that could affect RBC ambition to become Carbon Neutral by 2030 | 5.7 | Waste and Recycling | Between 2 and 5 years | Medium (5-25%) |
Impact of round re-balancing | 5.8 | Waste and Recycling | Between 2 and 5 years | Medium (5-25%) |
6. Community and Businesses
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
Signposting to support and grants for SMEs around green business issues | 6.1 | Economic Development/ Community | Between 2 and 5 years | Low (less than 5%) |
Support our big businesses to act as champions of low carbon in Rushcliffe, to share ideas and support other businesses in the Borough, particularly Small / Medium Enterprises | 6.2 | Community | Within 1 to 2 years | Low (less than 5%) |
Continue to deliver the bespoke support for Rushcliffe Parish Councils in order to give them the information needed to decarbonise their own assets, bid into grant funding pots and develop their own outreach campaigns for resident. | 6.3 | Community | Between 2 and 5 years | Low (less than 5%) |
Promote use of green spaces through social prescribing | 6.4 | Community | Between 2 and 5 years | Low (less than 5%) |
Promote sustainable management of sports clubs / grounds | 6.5 | Community | Between 2 and 5 years | Low (less than 5%) |
Continue to deliver the promotion of climate change through our trained in-house Carbon Literacy and Climate Fresk Senior Ecologist and Sustainability Officer, to both internal and external stakeholders. Continue delivering the Parish Council climate change support through visiting them and giving high level support. | 6.6 | Community | Between 2 and 5 years | Low (less than 5%) |
Identify and work with key influencers within Rushcliffe on Carbon Management best practice | 6.7 | Executive Management Team / Cabinet | From 5 to 10 years | Low (less than 5%) |
Repair bike voucher scheme (Promote to local residents) | 6.8 | Community | Between 2 and 5 years | Low (less than 5%) |
Investigate schools engagement programme around climate change / sustainability | 6.9 | Community | Between 2 and 5 years | Low (less than 5%) |
Work with Town and Parish Councils to try and align RBC Carbon Neutral ambitions | 6.10 | Community | Between 2 and 5 years | Medium (5-25%) |
In addition to the Carbon Management Plan we have Operational actions which are monitored.
7. Operational Activities
Action | Reference | Lead Specialist | Timescale |
|---|---|---|---|
Provide strategic and financial leadership to drive ongoing carbon reductions | 7.1 | Senior Management / Cabinet | From 5 years to 10 years |
Develop and promote Carbon Clever Brand | 7.2 | Communities | From 5 years to 10 years |
Review council publications and see if reduced carbon options are possible (e.g. e-publications) | 7.3 | Democratic | Within 1 to 2 years |
Carry out assessment of facilities single plastic use and review options to reduce | 7.4 | Community | Within 1 to 2 years |
Audit carbon footprint of events / council engagements and review options to reduce | 7.5 | Community | Within 1 to 2 years |
Use electronic payments and documentation where possible. Move away from sending cheques and look to make payments electronically. Switch over to e-billing for companies that we still receive paper invoices from (where available). Increase use of email for remittances / invoices / reminders etc. | 7.6 | Financial Services | Within 1 to 2 years |
Establish a Climate Change Action Reserve fund (facilitating other actions in this plan) | 7.7 | Executive Management Team / Cabinet | Within 1 to 2 years |
Establish Baseline for RBC Scope 3 emissions (including Leased buildings and Supply Chain) | 7.8 | Community | Within 1 to 2 years |
Digital First - Printing reduction for Member papers/agendas and reports | 7.9 | Community | Within 1 to 2 years |
Carbon Literacy training for staff and Members | 7.10 | Community | Within 1 to 2 years |
8. Offsetting
Action | Reference | Lead Specialist | Timescale | Estimated Potential CO2e Saving |
|---|---|---|---|---|
Revisit existing large stock such as Rushcliffe Arena and work with established contractors to develop fabric enhancements, existing system efficiencies and retrofit renewable energy systems that both save large amounts of money and carbon. | 8.1 | Transformation | Between 2 and 5 years | - |
Investigate set up a Carbon Offset Fund through Section 106 agreements / Community Infrastructure Levy (CIL). Will generate funds for investment in low carbon projects. | 8.2 | Planning and | Between 2 and 5 years | - |
Develop a tree planting plan on council portfolio | 8.3 | Community | Within 1 to 2 years | High (more than 25%) |
Establish RBC’s own tree nursery (so native trees can be grown from seeds) | 8.4 | Community | Between 2 and 5 years | Low (less than 5%) |
Replace wind turbines at Rushcliffe Country Park if cost effective to do so | 8.5 | Community | Within 1 to 2 years | - |
Consider establishing a community energy scheme (a community owned energy generating company e.g. community solar farm) Solar bulk purchase via an auction and also working with community groups like Bunny Energy Group to assist in delivering community schemes | 8.6 | Community | Between 2 and 5 years | Low (less than 5%) |
Investigate Natural Climate Solutions for Rushcliffe, in line with Rushcliffe Nature Conservation Strategy, in partnership with land owners / managers | 8.7 | Community | Between 2 and 5 years | Low (less than 5%) |
Look to purchase land. Pro-active approach, for off-setting. | 8.8 | Transformation | Within 1 to 2 years | Medium (5 to 25%) |
Accessible Documents
- Air Quality Action Plan 2021
- Annual Air Quality Reports
- Air Quality Strategy for Nottingham and Notts
- Annual Governance Statements
- Asset Management Strategy
- Become a Councillor 2022
- Budget and Financial Strategy
- Capital and Investment Strategy
- Climate Change Strategy 2021-2030
- Complaints Policy
- Confidential Reporting Code
- Council Constitution
- Contaminated Land
- Corporate Enforcement Policy
- Corporate Strategy 2024-2027
- Council Tax Recovery and Enforcement Policy 2026
- Customer Access Strategy
- Design Code Baseline Appraisal
- Discretionary Housing Payments Policy 2024-2025
- Disabled Facilities Grant Policy
- Disclosure and Barring Service Policy
- Economic Growth Strategy 2024
- Empty Homes Strategy
- Environment Policy 2023
- Equality, Diversity and Inclusion Scheme
- External Audit Completion Report 2024
- External Audit Completion Report 2023
- Freedom Of Information Policy
- HB Recovery and Enforcement Policy
- Homelessness and Rough Sleeping Strategy
- Housing Allocations Policy
- Housing Enforcement Policy
- ICT Strategy 2022 -25
- Information Management and Governance Strategy 2022-25
- Rushcliffe Borough Council Information Retention Schedule
- Internal Audit
- Leisure Strategy 2021-2028 review
- Local Code of Corporate Governance 2026/27
- Local Plan Part 1: Core Strategy
- Local Plan Part 2: Land and Planning Policies
- Local Plan Monitoring Report
- Local Scheme of Validation
- Off-street Car Parking Strategy
- Pay Policy Statement 2026/27
- People Strategy 2021-26
- Planning Enforcement Policy
- Play Strategy
- Procurement Strategy
- 2021-22 Public Inspection Notice
- RIPA Policy and Guidance
- Risk Management Strategy 2026-29
- Solar Farm Landscape Sensitivity and Capacity Study
- Statement of Gambling Licensing Principles
- Statement of Accounts
- Statement of Licensing Policy
- Street Trading Policy
- Supplementary Planning Documents
- Tenancy Strategy 2019
- Transformation Strategy and Efficiency Plan
- Tree Management and Protection Policy 2023
- WISE Agreement
- Conservation Areas
- Neighbourhood Plans
- The Nature of Rushcliffe 2021
- The Nature of Rushcliffe 2019
- Anti-Slavery Policy
- Modern Slavery & Human Trafficking Transparency Statement 2024-2025
- Annual Infrastructure Funding Statements
- Anti-Fraud & Corruption Policy 2025
- Communications and Engagement Strategy 2025-28
- Rushcliffe Design Code
- Technology, Digital and Customer Access Strategy
- Rushcliffe Nature Conservation Strategy
- Strategic Housing Land Availability Assessment Report 2024
- Biodiversity Duty Report January 2024 to December 2025
- Hackney Carriage and Private Hire Licensing Policy 2025 - 2030
- Playing Pitch Strategy 2025-28
- Collecting Unpaid Non Domestic Rates - Recovery and Enforcement Policy 2026
- Strategic Housing Land Availability Assessment Report 2025
- External Audit Completion 2025/26
- Transformation Strategy and Efficiency Plan
- Carbon Management Plan 2024
- External Audit Reports
- Local Plan Monitoring Report
- Land Charges Access to Information