Annual Infrastructure Funding Statement 2019-20

Rushcliffe Borough Council Annual Infrastructure Funding Statement 2019-20

Published 16 March 2021

Contents

 

Appendices

Appendices: List of Schedule 2 requirements for the Infrastructure Funding Statement
Appendix 1: Community Infrastructure Levy
Appendix 2: Section 106 Planning Obligations

 

1. Introduction

1.1 Purpose of Report

This report provides information on the monetary (and non-monetary) contributions sought and received from developers for the provision of infrastructure to support development in Rushcliffe, and the subsequent use of those contributions by Borough Council. The report covers the financial year 1 April 2019 – 31 March 2020. Rushcliffe seeks developer contributions through the Community Infrastructure Levy (CIL) and Section 106 agreements (also known as “planning obligations”).

1.2 CIL Charging Schedule

CIL was adopted by the Council on 7 October 2019, part way through the 2019-20 reporting year. CIL is a set charge, based on the gross internal area floorspace of buildings, on most new development to help fund the infrastructure needed to address the cumulative impact of development across our area. The charging schedule, setting out the CIL rates for different areas and types of development in the Borough, is available on our website.

1.3 Use of CIL Funds

Local planning authorities must use CIL to fund ‘the provision, improvement, replacement, operation or maintenance of infrastructure to support the development of the area’. There is also a neighbourhood portion of CIL which is similarly able to fund infrastructure but can also fund ‘anything else that is concerned with addressing the demands that development places on an area’. CIL Charging authorities must pay 15% of CIL receipts to the Parish Council for the area where a CIL liable development takes place, rising to 25% if the Parish
has a Neighbourhood Plan in place. In unparished areas (for Rushcliffe, this includes West Bridgford), the CIL charging authority can spend equivalent amounts in the locality, following engagement with local communities.

1.4 Use of S106 Planning Obligations

Section 106 of the Town and Country Planning Act 1990 enables a local planning authority to enter into planning obligations – legal agreement which mitigate the impact of a specific development, to make it acceptable in planning terms. The planning obligation might, for example, require the provision or contribution to a new or improved road, school, health facility or local green infrastructure. Local planning authorities can also seek planning obligations to secure a proportion of affordable housing from residential developments.

1.5 County Council Obligations

Some planning obligations for development within the Borough may also be made with the Nottinghamshire County Council, where those obligations relate to Education, Highways, or other matters for which the County Council are directly responsible. For the avoidance of doubt, this IFS will report solely on obligations made with the Borough Council. This document should be read in conjunction with the Nottinghamshire County Council’s infrastructure funding statement. The County Council also covers improvements to highway infrastructure under Section 278 of the Highways Act 1980.

2. Community Infrastructure Levy Report

The information below is provided to comply with the requirement to report on CIL collection, allocation, and expenditure within the 2019-20 year.

2.1 CIL Instalments

A CIL charge is payable either within 60 days of the commencement of a development, or within the terms of the Borough Council’s adopted Instalment Policy. For CIL charges under £50,000, a single instalment is due within 90 days; charges between £50,000 and £250,000 are due in two instalments within 300 days; and charges over £250,000 are due in four instalments within 570 days. A full breakdown is available on our website.

2.2 Demand Notices

The CIL Demand Notice sets out the whole sum payable and the instalments required, and therefore CIL Demand Notices issued during a particular year do not necessarily equate to the CIL sums likely to be received during that year. In addition, developments can be altered through further planning permissions over time, often resulting in revised Demand Notices needing to be issued. Re-issued Notices are not double-counted in this report; if a Demand Notice is issued and then re-issued in the same reporting year, only the re-issued Notice is included within the figure for CIL invoiced during the year.

2.3 Recent Adoption of CIL 

Due to the time at which CIL was adopted within the Borough, no developments incurring a CIL charge were commenced between 1 April 2019 and 31 March 2020. As such, no figures were set out in demand notices, nor were any CIL monies received, allocated, or spent during the reported year. For completeness, the reporting figures required by the CIL Regulations (Reg 121A) are included at the end of this document in Appendix 1.

2.4 Infrastructure List

Regulation 121A(1)(a) requires the Infrastructure Funding Statement to include details of the infrastructure projects or types of infrastructure which the charging authority intends will be, or may be, wholly or partly funded by CIL (other than CIL to which regulation 59E or 59F applies). This is known as the Infrastructure List. It is intended to provide transparency on how an authority intends to use CIL funds. The list below sets out those infrastructure projects that Rushcliffe Borough Council may wholly or partly fund by the CIL.

Infrastructure that may be wholly or partly funded by CIL

  • Provision of Park and Ride along the A52 corridor and bus priority measures in West Bridgford.
  • Provision of or improvements to playing pitches and ancillary facilities.
  • Provision of or improvements to indoor leisure provision.
  • Provision of additional secondary school places across the Borough through new provision or extension to existing provision.
  • Provision of health facilities across the Borough through new provision or extension to existing provision.

2.5 Interaction between CIL and S106

The inclusion of a project or type of infrastructure on this list does not signify a commitment from the Council to fund (either in whole or in part) the listed project or type of infrastructure through CIL, nor does the ordering of the table imply any preference for expenditure. In some circumstances, there will also still be a legitimate role in using S106 planning obligations to secure funding towards items which may be covered by CIL.

2.6 Future Review of CIL Infrastructure

The Council will review this list in subsequent publications of the infrastructure funding statement. It is anticipated that amount of CIL receipts will be limited in the first years after adoption, given that contributions are not payable until commencement of development.

3. Section 106 (Planning Obligations) Report

The information below is provided to comply with the requirement to report on S106 collection, allocation, and expenditure within the 2019-20 year, as well as details of non-financial obligations. Copies of any of the S106 agreements referenced below can be found by searching the associated reference number on our Planning Online webpage.

3.1 Headline Figures

The table below gives an overview of the sums held, received and spent during the 2019-20 period. A further breakdown of each item is included in later sections of the report.

S106 Movement: 2019-20

  • Opening Balance (01/04/2019): £14,878,030.92
  • Contributions Received: £2,818,957.07
  • Contributions Spent: £350,759.00
  • Interest Accrued: £81,912.70
  • Closing Balance (31/03/2020): £17,419,861.69

3.2 New Obligations

The total amount of money expected to be provided under any planning obligations which were entered into during the reported year is £27,749,972.61. Note that in some instances, it is not possible to give precise figures until the exact number / mix of houses on a particular development has been agreed, or where contributions may be payable as an alternative to expected on-site delivery of infrastructure or affordable housing. The figure above is therefore a baseline figure and the eventual amount collected may be higher than reported. A full breakdown of the financial and non-financial contributions for each agreement entered into in 2019-20 is set out in the tables below:

Land East And West Of Nottingham Road, South Of Clifton (14/01417/OUT)

Land East And West Of Nottingham Road, South Of Clifton (14/01417/OUT)
Contribution Amount Details
Primary Education £10,006,000.00 -
Secondary Education £7,185,338.00 -
Health £2,760,000.00 -
Bus Service £300,000.00 -
Monitoring £60,000.00 -
Travel Plan
Monitoring
£27,000.00 -
Affordable Housing Non-financial Minimum 10% - Exact number to be agreed through future affordable housing schemes on each phase of residential development
Highways Infrastructure Non-financial Footpath / Cycle Link
Land Non-financial Health Facility Site
Land Non-financial Open Space Land
Land Non-financial Primary School Site
Sports and Leisure Non-financial Joint Sports Changing Facility
and Community Centre
Total (Expected): £20,338,338.00 -

 

Land East of Main Road, Cotgrave (18/02821/FUL)

Land East of Main Road, Cotgrave
Contribution Amount
Monitoring £273.00
Bus Stops £17,500.00
Total (Expected): £17,773.00

 

Land at Asher Lane, Ruddington (18/00300/OUT)

Land at Asher Lane, Ruddington (18/00300/OUT)
Contribution Amount Details
Primary Education £704,776.00 -
Secondary Education £497,084.00 -
Transport £30,000.00 -
Health £158,440.00 -
Library £6,174.00 -
Sports £71,919.00 -
Monitoring £3,000.00 -
Affordable
Housing
Non-financial 30% (53 Units)
Open Space Non-financial -
Total (Expected) £1,471,393.00 -

 

Thoroton Farm, Main Street, Thoroton (18/02084/VAR)

Thoroton Farm, Main Street, Thoroton
Contribution Amount
Affordable Housing £130,782.00

 

Land at Grooms Cottage, Shelford Road, Radcliffe On Trent (18/02269/OUT)

Land at Grooms Cottage, Shelford Road, Radcliffe On Trent
Contribution Amount Details
Primary Education £228,576.00 -
Secondary Education £159,777.00 -
Network Rail £2,000.00 -
Bus Stops £17,000.00 Bus Stop contribution not payable if
bus stop contribution in S106 for
13/02329/OUT is paid
Health £600 per 1 bed
dwelling + £920
per 2+ bedroom
dwelling
-
Sports Hall £21,608.00 -
Sports Pitches £24,930.00 -
Swimming Pool £23,260.00 -
Monitoring £3,276.00 -
Affordable Housing Non-financial 30% (16 Units)
Open Space Non-financial -
Total £480,427.00 plus -

 

Land Between Platt Lane And Station Road, Keyworth (18/02412/FUL)

Land Between Platt Lane And Station Road, Keyworth
Contribution Amount Details
Secondary
Education
£532,590.00 -
Bus Stops £45,000.00 -
Health £43,010.00 -
Swimming Pool £78,755.00 -
Sports Hall £73,160.00 -
Sports Pitches £24,972.00 -
Sports Pitches
Maintenance
£7,294.35 -
Bus Pass £47,000.00 -
Bus Service £80,000.00 -
Monitoring £2,184.00 -
Affordable Housing Non-financial 20% (37 Units)
Open Space Non-financial -
Total £933,965.35 -

 

Land North of Bunny Lane, Keyworth (18/02515/FUL)

Land North of Bunny Lane, Keyworth
Contribution Amount Details
Secondary
Education
£639,108.00 -
Bus Stops £30,000.00 -
Health £51,060.00 -
Sports Hall £86,941.00 -
Swimming Pool £93,590.00 -
Sports Pitches £83,782.00 -
Sports Pitches
Maintenance
£24,768.00 -
Bus Pass £35,000.00 -
Bus Service £150,000.00 -
Monitoring £2,184.00 -
Waste
Management
£15,125.19 -
Affordable Housing Non-financial 20% (37 Units)
Bus Stops Non-financial Option to either pay contribution or
provide bus stops on site
Highways
Infrastructure
Non-financial Off-site highways Improvements
Open Space Non-financial -
Total £1,211,558.19 -

 

Former Sandicliffe Motor Group, 5 - 27 Loughborough Road, West Bridgford (18/02521/FUL)

Former Sandicliffe Motor Group, 5 - 27 Loughborough Road, West Bridgford
Contribution Amount
Affordable Housing £148,498.00
Health £39,120.00
Total £187,618.00

 

Land at Barnfield Farm, Nicker Hill, Keyworth (18/02524/OUT)

Land at Barnfield Farm, Nicker Hill, Keyworth
Contribution Amount Details
Secondary
Education
£426,072.00 -
Bus Stops £30,000.00 -
Health £34,730.00 -
Sports Hall £59,038.00 -
Swimming Pool £63,553.00 -
Sports Pitches £59,449.00 -
Sports and Leisure
Maintenance
£16,821.00 -
Bus Taster Ticket £24,000.00 -
Bus Service £90,000.00 -
Affordable Housing Non-financial

20% (30 Units) - Option to provide a Commuted Sum instead if unable to dispose of the Affordable Housing units to a Registered Provider

Allotments Non-financial -
Open Space Non-financial -
Sustainable Drainage Non-financial -
Total £803,663.00 -

 

Land East of Numbers 1 to 9 Springfield Close, Cropwell Bishop (18/02700/OUT)

Land East of Numbers 1 to 9 Springfield Close, Cropwell Bishop
Contribution Amount Details
Allotments £6,205.00 -
Affordable
Housing
Non-financial 30% (26 Units)
Open Space Non-financial -
Total £6,205.00 -

 

Land on Wilford Lane, West Bridgford (18/02920/HYBRID)

Land on Wilford Lane, West Bridgford
Contribution Amount Details
Retirement Health £600 per 1 bed
retirement flat +
£920 per 2+
bedroom
retirement flat
-
Health £600 per 1 bed
dwelling + £920
per 2+ bedroom
dwelling
-
Sports Pitches £246 per flat -
Sports Pitches Maintenance £145.51 per flat -
Monitoring £1,000.00 -
Biodiversity £21,000.00 -
Affordable Housing Non-financial 30% Exact number dependant on final
number of dwellings approved. Option
to provide a Commuted Sum instead if unable to dispose of the Affordable
Housing units to a Registered Provider
Allotments Non-financial -
Open Space Non-financial -
Total £22,000.00 plus -

 

Land East of Kirk Ley Road, East Leake (19/00323/FUL)

Land East of Kirk Ley Road, East Leake
Contribution Amount
Primary Education £113,829.77
Health £43,240.00
Library £2,160.12
Sports £20,116.00
Total £179,345.89

 

Land South East of Platt Lane, Keyworth (19/00472/OUT)

Land South East of Platt Lane, Keyworth
Contribution Amount Details
Monitoring £2,000.00 -
Open Space Non-financial -
Total £2,000.00 -

 

Land East of Loughborough Road, Ruddington (19/00535/OUT)

Land East of Loughborough Road, Ruddington
Contribution Amount Details
Primary Education £723,824.00 -
Secondary Education £552,392.00 -
Bus Stops £45,000.00 -
Health Sum £161,120.00 -
Sports Hall £70,436.00 -
Sports Pitches £108,040.00 -
Swimming Pool £75,824.00 -
Bus Ticket £40,000.00 -
Monitoring Sum £2,730.00 -
Footpath £65,000.00 -
Community Centre £73,000.00 -
Allotments £13,140.00 -
Affordable Housing Non-financial 30% (54 Units)
Open Space Non-financial -
Total £1,930,506.00 -

 

Land South Of Butt Lane, East Bridgford (19/00784/OUT)

Land South Of Butt Lane, East Bridgford
Contribution Amount Details
Monitoring £2,000.00 -
Affordable Housing Non-financial 30% - Exact number dependant on final number of dwellings approved. Option to provide a Commuted Sum instead if unable to dispose of the Affordable Housing units to a Registered Provider
Open Space Non-financial -
Total £2,000.00 -

 

Land at Manor Park, Ruddington (19/01616/FUL)

Land at Manor Park, Ruddington (19/01616/FUL)
Contribution Amount
Affordable Housing £226,700.00
Health £13,818.00
Total £240,518.00

 

3.3 S106 - Breakdown of Receipts

The below table covers contributions received from development sites within the Borough during the 2019-20 period. In some instances, further contributions may be due at later stages of development, and additional contributions may have already been collected in previous years.

S106 Receipts
Site Sum Collected
Land East & West of Chapel Lane, Bingham (10/01692/OUT) £1,405,307.00
Central College, Greythorn Drive, West Bridgford
(14/02716/FUL)
£642,718.00
Land Between Platt Lane And Station Road, Keyworth
(18/02412/FUL)
£272,489.47
Land South of Wilford Lane, West Bridgford (17/00673/FUL) £228,274.00
Zone 5 – Land off Melton Road, Edwalton (18/00457/FUL) £153,916.00
Land West of Malmic House, Brookside Road, Ruddington
(15/01793/FUL)
£68,885.00
Cotgrave Colliery, Stragglethorpe Road, Stragglethorpe
(10/00559/OUT)
£26,188.53
Land at Shelford Road Farm, Radcliffe on Trent
(13/02329/OUT)
£12,207.00
Stanford Hall, Melton Road, Stanford on Soar
(12/02070/HYBRID)
£7,867.20
Rebbur House, Nicker Hill, Keyworth (15/03084/FUL) £822.44
Bridgford House, Pavilion Road, West Bridgford
(17/01981/FUL)
£282.43
Total £2,818,957.07

 

3.4 S106 Allocations

The below table covers contributions that have been allocated to projects during the 2019-20 period. Though there is usually a definition for what certain contributions under a S106 agreement can be used for, allocation represents a firm commitment of the use of particular funds for a specific purpose.

S106 Allocations
Project Sum Allocated
New Community Hall as part of a wider development on land owned by Rushcliffe Borough Council at Chapel Lane,
Bingham
£1,860,297.90
Two storey extension at Ash Lea School, Cotgrave £639,733.51
Metropolitan Housing (Phase 2A) – Redevelopment of garage sites for Affordable Housing £477,176.03
New classroom space at Heymann Primary School, West
Bridgford
£259,236.20
Extension of shared footway / cycleway between Newton and
Bingham
£203,747.71
Upgrades to existing bus stops and cycle network signage
within Bingham
£107,958.11
Bus stop upgrades along Leake Lane, Stanford on Soar £30,712.00
Increased Stock at East Leake Library £8,000.00
Play equipment upgrades at Meadow Park, East Leake £4,459.17
Total £3,591,320.63

*Note that these project allocations are not included within the reporting criteria in
Appendix 1b(g), as the committed funds were also spent within the reported year.

3.5 S106 Breakdown of Spend

The below table covers contributions that have been spent on projects during the 2019-20 period. Most often this will be the transfer of funds to the body who has carried out and completed the work, so as to ensure the money has been spent in accordance with the S106 Agreement, though there may be situations (particularly with larger infrastructure items) where payments may be phased/provided in
advance in order to assist with cash flow.

S106 Spending - Infrastructure projects
Project Sum Released
Dining Hall Extension at West Bridgford Academy £303,727.76
New Play Equipment at Meadow Park, East Leake £16,193.83
Pavilion Improvements at Whatton & Aslockton Playing Fields £15,500.00
Bus Stop Improvements along Camelot Street, Ruddington £15,337.41
Total £350,759.00

 

3.6 Commuted Sums

The below table details the value of commuted sums that the Borough Council held at the end of the 2023-24 period. Commuted sums are intended to cover the long-term maintenance of certain items of infrastructure, and will be gradually spent over the course of a particular period of time.

S106 Commuted Sums
Project Sum Retained
Open Space Maintenance, Woodroffe Way, East Leake £32,346.51
Sports and Playing Pitches Maintenance, Former Cotgrave
Colliery
£26,320.33
Open Space Maintenance, Ludlow Hill Road, West Bridgford £20,119.65
Open Space Maintenance, Gotham Road, East Leake £19,074.45
Open Space Maintenance, Grantham Road, Radcliffe on
Trent
£9,520.02
Open Space Maintenance, Rectory Road, Sutton Bonington £5,979.86
Open Space Maintenance, Plumtree Road, Cotgrave £2,532.49
Total £115,893.31

 

Appendices

List of Schedule 2 requirements for the Infrastructure Funding Statement

Appendix 1: Community Infrastructure Levy

Community Infrastructure Levy - reporting
Appendix 1 - CIL Reporting Figures Sum
(a) the total value of CIL set out in all demand notices issued in the reported year £0
(b) the total amount of CIL receipts for the reported year £0
(c) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year but which have not been allocated £0
(d) the total amount of CIL receipts, collected by the authority, or by another person on its behalf, before the reported year and which have been allocated in the reported year £0
(e) the total amount of CIL expenditure for the reported year £0
(f) the total amount of CIL receipts, whenever collected, which were allocated but not spent during the reported year £0
(g) in relation to CIL expenditure for the reported year, summary details of: -
(i) payments) has been spent, and the amount of CIL spent on each item £0
(ii) the amount of CIL spent on repaying money borrowed,
including any interest, with details of the items of
infrastructure which that money was used to provide
(wholly or in part)
£0
(iii) the amount of CIL spent on administrative expenses
pursuant to regulation 61, and that amount expressed as a percentage of CIL collected in that year in accordance with that regulation
£0
(h) in relation to CIL receipts, whenever collected, which were allocated but not spent during the reported year, summary details of the items of infrastructure on which CIL (including land payments) has been allocated, and the amount of CIL allocated to each item £0
(i) the amount of CIL passed to: -
(i) any parish council under regulation 59A or 59B; and £0
(ii) any person under regulation 59(4) £0
(j) summary details of the receipt and expenditure of CIL to which regulation 59E or 59F applied during the reported year including: -
(i) the total CIL receipts that regulations 59E and 59F
applied to
£0
(ii) the items of infrastructure to which the CIL receipts to
which regulations 59E and 59F applied have been
allocated or spent, and the amount of expenditure
allocated or spent on each item
£0
(k) summary details of any notices served in accordance with regulation 59E, including: -
(i) the total value of CIL receipts requested from each
parish council
£0
(ii) any funds not yet recovered from each parish council at the end of the reported year £0
(l) the total amount of: -
(i) CIL receipts for the reported year retained at the end of the reported year other than those to which regulation 59E or 59F applied £0
(ii) CIL receipts from previous years retained at the end of
the reported year other than those to which regulation 59E or 59F applied
£0
(iii) CIL receipts for the reported year to which regulation
59E or 59F applied retained at the end of the reported
year;
£0
(iv) CIL receipts from previous years to which regulation
59E or 59F applied retained at the end of the reported
year
£0

 

Appendix 2: Section 106 Planning Obligations

Section 106 Planning Obligations
Project Sum Allocated
(a) the total amount of money to be provided under any
planning obligations which were entered into during the
reported year
£27,749,972.61
(b) the total amount of money under any planning obligations which was received during the reported year £2,818,957.07
(c) the total amount of money under any planning obligations which was received before the reported year which has not been allocated by the authority  £4,090,511.14
(d) summary details of any non-monetary contributions to be provided under planning obligations which were entered into during the reported year, including details of: -
(i) in relation to affordable housing, the total number of
units which will be provided
See Section 3.2
(ii) in relation to educational facilities, the number of school places for pupils which will be provided, and the category of school at which they will be provided See Section 3.2
(e) the total amount of money (received under any planning obligations) which was allocated but not spent during the reported year for funding infrastructure £3,591,320.63
(f) the total amount of money (received under any planning
obligations) which was spent by the authority (including
transferring it to another person to spend)
£350,759.00
(g) in relation to money (received under planning obligations) which was allocated by the authority but not spent during the reported year, summary details of the items of infrastructure on which the money has been allocated, and the amount of money allocated to each item See Section 3.4
(h) in relation to money (received under planning obligations) which was spent by the authority during the reported year (including transferring it to another person to
spend), summary details of:
-
(i) the items of infrastructure on which that money
(received under planning obligations) was spent, and the
amount spent on each item
See Section 3.5
(ii) the amount of money (received under planning
obligations) spent on repaying money borrowed, including
any interest, with details of the items of infrastructure
which that money was used to provide (wholly or in part)
£0
(iii) the amount of money (received under planning
obligations) spent in respect of monitoring (including
reporting under regulation 121A) in relation to the delivery
of planning obligations
£0
(i) the total amount of money (received under any planning
obligations) during any year which was retained at the end of the reported year, and where any of the retained money has been allocated for the purposes of longer term maintenance (“commuted sums”), also identify separately the total amount of commuted sums held
See Section 3.6